Solar Panel Installation in Pasay
SolarPro Install provides complete solar panel installation for homes and businesses across all Pasay barangays. We are a Meralco-accredited and DOE-accredited solar installer with a PRC-licensed electrical engineer on every project. We handle system design, permits, installation, and Meralco net metering registration end-to-end.
Serving all Pasay barangays · Meralco-accredited · Net metering included · DOE-accredited
DOE-Accredited
Solar Installer
Meralco-Accredited
Solar Installer
ERC Net Metering
Accredited
PRC-Licensed
Electrical Engineer
Serving:
Mall of Asia Area
Baclaran
Libertad
Malibay
San Isidro
All Pasay Barangays
Why Solar Makes Sense in Pasay
Pasay is one of Metro Manila’s most commercially active cities, home to the SM Mall of Asia complex, the Entertainment City reclamation area, Ninoy Aquino International Airport, and a dense mix of residential barangays and commercial corridors. Monthly Meralco bills for Pasay commercial properties and mid-sized residences are among the highest in the metro, driven by year-round air conditioning loads and continuous commercial operations.
Pasay sits within Metro Manila’s average solar irradiance band of 5.1 kWh per square meter per day. Residential properties in Baclaran, Libertad, Malibay, and San Isidro with unshaded rooftop access are viable candidates for 3 kWp to 8 kWp systems. Commercial properties along Roxas Boulevard, Diosdado Macapagal Avenue, and the reclamation area can accommodate larger systems. The solar savings potential for Meralco customers depends on your monthly consumption and available roof area, confirmed at the free site assessment.
Solar Installation Services We Provide in Pasay
Every SolarPro Install project in Pasay covers four service areas from initial assessment to Meralco net metering commissioning. All permits, documentation, and Meralco coordination are handled by SolarPro Install as part of the standard fixed-price contract.
Residential Solar Installation
Solar panel installation for homes in Baclaran, Libertad, Malibay, San Isidro, Villamor, Pio del Pilar, and all other Pasay barangays. Pasay residential properties typically feature concrete rooftops well suited for standard tilted or flush-mounted solar systems. We size each system to your Meralco consumption and available roof area.
Commercial Solar Installation
Solar installation for commercial properties, hotels, BPO offices, and businesses throughout Pasay’s commercial corridors. Properties along Roxas Boulevard and Diosdado Macapagal Avenue with large flat rooftops can accommodate 20 kWp to 100 kWp systems delivering significant reductions on high monthly Meralco commercial bills.
LGU Permit Coordination
A Building Permit and Electrical Permit from the Pasay City Engineering Office are required for every solar installation. SolarPro Install prepares and files all permit documents with the Pasay LGU on your behalf as part of the standard service.
Meralco Net Metering Application
Pasay Solar Savings by System Size
Figures below use Metro Manila irradiance of 5.1 kWh/m²/day and current Meralco residential rates. All costs are all-in: panels, inverter, mounting, wiring, LGU permits, and Meralco net metering application included. See the full solar panel installation cost guide for the Philippines for a detailed breakdown.
3 kWp₱200K–₱280KEst. ₱2K–₱3.5K/month
5 kWp₱350K–₱480KEst. ₱3.5K–₱5.5K/month
8 kWp₱560K–₱680KEst. ₱5.5K–₱8K/month
10 kWp₱700K–₱900KEst. ₱8K–₱12.5K/month
Pasay Solar: Commercial Hub, High Meralco Loads, Strong Solar ROI.
How Net Metering Works for Pasay Meralco Customers
All Pasay properties served by Meralco are eligible for the ERC Net Metering Program under Republic Act 9513. Once your solar system is commissioned and Meralco installs the bi-directional meter, excess electricity generated flows to the Meralco grid and earns credits applied against your next monthly bill. Credits roll over month to month. Learn more about how net metering works for Meralco customers.
1
Document Submission
SolarPro Install submits the Application Form, CFEI, Amended NMA, and COC Application Fee to Meralco on your behalf.
2
Distribution Impact Study
Meralco evaluates the impact of your solar system on the local distribution network and transformer hosting capacity in your Pasay barangay.
3
Inspection and Approval
Meralco inspects your installation and approves the grid connection. SolarPro Install coordinates all scheduling and follow-up with Meralco.
4
Bi-Directional Meter Installation
Meralco installs your bi-directional meter. DIMC fee shall not exceed ₱3,000 for residential per ERC Advisory September 22, 2025. Net metering credits begin on your next bill.
Frequently Asked Questions from Pasay Property Owners
Does Meralco serve all of Pasay?
Yes. Meralco is the distribution utility for all of Pasay City. All residential and commercial properties in Pasay connected to the Meralco grid are eligible for solar panel installation and net metering under the ERC Net Metering Program.
Can commercial buildings near the airport in Pasay install solar?
Properties near Ninoy Aquino International Airport may be subject to height and structure restrictions set by the Civil Aviation Authority of the Philippines. Rooftop solar installations must comply with these regulations. SolarPro Install accounts for any CAAP zone restrictions during the site assessment to determine what system configuration is permissible for your specific property.
What permits are required for solar installation in Pasay?
A Building Permit and Electrical Permit from the Pasay City Engineering Office are required. The CFEI issued by the Pasay LGU after installation is required for the Meralco net metering application. SolarPro Install coordinates all permit filings as part of the full installation service.
How long does solar installation take in Pasay?
Physical installation takes one to two days for a standard residential system. The full process from site assessment to Meralco net metering commissioning typically takes 2 to 4 months, covering LGU permit processing and Meralco’s Distribution Impact Study. SolarPro Install manages all application steps on your behalf.
Is the Pasay reclamation area within the Meralco franchise area?
Yes. All properties within Pasay City, including the Entertainment City reclamation area and properties along Diosdado Macapagal Avenue, are served by Meralco and qualify for the ERC Net Metering Program. If your property has a Meralco account, it is eligible for solar installation and net metering registration.