Solar Panel Installation in Makati

SolarPro Install provides complete solar panel installation for homes and businesses across all Makati barangays. We are a Meralco-accredited and DOE-accredited solar installer with a PRC-licensed electrical engineer on every project. We handle system design, permits, installation, and Meralco net metering registration end-to-end.

Serving all Makati barangays · Meralco-accredited · Net metering included · DOE-accredited

Get your free solar quote
 
DOE-Accredited
Solar Installer
 
Meralco-Accredited
Solar Installer
 
ERC Net Metering
Accredited
 
PRC-Licensed
Electrical Engineer
Serving:
Rockwell
San Antonio Village
Bel-Air
Forbes Park
Legazpi Village
Dasmarinas Village
All Makati Barangays

Why Solar Makes Sense in Makati

Makati is the financial capital of the Philippines and one of the highest-value solar installation markets in the Meralco franchise area. With premium residential communities, dense commercial corridors, and large institutional buildings all running high Meralco bills, Makati homeowners and business operators have a compelling financial case for solar.

For commercial properties and large residences in Makati, where monthly Meralco bills regularly exceed ₱15,000 to ₱50,000 or more, solar panel installation delivers some of the fastest payback periods in the entire Meralco service area. A properly designed 8 kWp to 20 kWp system can offset 40 to 70 percent of electricity consumption for a mid-size commercial property.

Solar Installation Services We Provide in Makati

Every SolarPro Install project in Makati covers four service areas from initial assessment to Meralco net metering commissioning. All permits, documentation, and Meralco coordination are handled by SolarPro Install as part of the standard fixed-price contract.

Residential Solar Installation
Solar installation for homeowners in Rockwell, San Antonio Village, Magallanes Village, Bel-Air, Dasmarinas Village, Forbes Park, Legazpi Village, and all other Makati barangays. We assess roof structure, orientation, shading from adjacent buildings, and Meralco consumption to size the system correctly for your property.
Commercial Solar Installation
Solar installation for office buildings, retail establishments, restaurants, hotels, and institutional properties across Makati’s commercial districts. Systems from 10 kWp to 100 kWp designed and installed as a complete turnkey service. High daytime Meralco loads in commercial Makati make solar one of the fastest-payback investments available.
LGU Permit Coordination
A Building Permit and Electrical Permit from the Makati LGU are required for every solar installation. SolarPro Install prepares and files all permit documents with the Makati City Engineering Office and Building Department on your behalf as part of the standard service.
Meralco Net Metering Application
We manage the complete four-step Meralco net metering application process in the Philippines from document submission through bi-directional meter installation. The residential DIMC fee is capped at ₱3,000 per the ERC Advisory dated September 22, 2025. SolarPro Install is a Meralco-accredited solar installer — a required credential for your net metering application to be accepted by Meralco.

Makati Solar Savings by System Size

Figures below use Metro Manila irradiance of 5.1 kWh/m²/day and current Meralco residential rates. All costs are all-in: panels, inverter, mounting, wiring, LGU permits, and Meralco net metering application included. Makati installations with roof constraints use high-efficiency monocrystalline panels to maximize kWp output in limited roof area. See the full solar panel installation cost guide for the Philippines.

3 kWp₱200K–₱280KEst. ₱2K–₱3.5K/month
5 kWp₱350K–₱480KEst. ₱3.5K–₱5.5K/month
8 kWp₱560K–₱680KEst. ₱5.5K–₱8K/month
10 kWp₱700K–₱900KEst. ₱8K–₱12.5K/month
Makati Solar: High Bills, Limited Roof Space, Maximum ROI.

How Net Metering Works for Makati Meralco Customers

All Makati properties served by Meralco are eligible for the ERC Net Metering Program. Once your solar system is commissioned and Meralco installs the bi-directional meter, excess electricity flows to the Meralco grid and earns credits applied against your next monthly bill. Credits roll over month to month. For high-consumption commercial properties in Makati, net metering amplifies the financial return beyond direct self-consumption alone. Learn more about how net metering works for Meralco customers.

1
Document Submission
SolarPro Install submits the Application Form, CFEI, Amended NMA, and COC Application Fee to Meralco on your behalf.
2
Distribution Impact Study
Meralco evaluates the impact of your solar system on the local distribution network and transformer hosting capacity in your Makati barangay.
3
Inspection and Approval
Meralco inspects your installation and approves the grid connection. SolarPro Install coordinates all scheduling and follow-up with Meralco.
4
Bi-Directional Meter Installation
Meralco installs your bi-directional meter. DIMC fee shall not exceed ₱3,000 for residential per ERC Advisory September 22, 2025. Net metering credits begin on your next bill.

Frequently Asked Questions from Makati Property Owners

Can solar panels be installed on high-rise or mid-rise buildings in Makati?
Yes, on the rooftop level. Buildings with accessible flat rooftops can install solar systems using ballasted racking that requires no structural penetrations. Building management and condominium corporation approval is required for shared roof installations. Our site assessment determines the feasibility and appropriate system design for each property.
Does Meralco serve all of Makati?
Yes. Meralco is the distribution utility for all of Makati City. All properties in Makati connected to the Meralco grid are eligible for solar panel installation and the ERC Net Metering Program.
What permits are required for solar installation in Makati?
A Building Permit and Electrical Permit from the Makati LGU are required. The CFEI issued by the Makati City Building Department is also required for the Meralco net metering application. SolarPro Install coordinates all permit applications with the Makati City Engineering Office as part of the full-service package.
What is the best solar system size for a Makati commercial property?
Commercial properties in Makati typically benefit most from systems in the 8 kWp to 20 kWp range, depending on available rooftop area and monthly kWh consumption. A site assessment using 12 months of Meralco billing data provides the most accurate sizing recommendation.
How does shading from adjacent buildings affect solar output in Makati?
Shading is a genuine design constraint in Makati’s dense urban environment. Our site assessment includes a shading analysis at different times of day. In shaded environments, microinverters or module-level power electronics may be specified over standard string inverters to minimize partial shading losses.

Request a Free Solar Assessment for Your Makati Property

SolarPro Install serves all Makati barangays as part of our Metro Manila solar installation coverage. DOE-accredited, Meralco-accredited, and ERC Net Metering accredited. Request a free site assessment today.